TSE Line Project (Tecnimont)

“Best Group is proud to announce that we have officially commenced work as the subcontractor for Tecnimont on a major polyethylene plant project within the new polymers complex in Ras Laffan Industrial City, Qatar. This significant undertaking is a joint venture between Qatar Energy and Chevron Phillips Chemical, and it involves constructing two state-of-the-art polyethylene units with impressive capacities of 1,000,000 tons per year and 680,000 tons per year, respectively.

For Qatar Energy and Chevron Phillips Chemical, this project represents a strategic expansion in the Middle East. The new polyethylene units will significantly increase production capacity, allowing the joint venture to meet the growing demand for polyethylene products in the region and globally.

For Qatar, this project is a major boost to its petrochemical sector. It not only creates jobs during the construction and operational phases but also stimulates local businesses through procurement and service contracts. As part of this transformative project, Best Group is committed to delivering excellence, thereby strengthening Qatar’s position as a leader in the global petrochemical market and contributing to the nation’s economic resilience.”

The Treatment Sewage Effluent project consists of two parts: the TSE line and the landscaping and irrigation system. The TSE line includes a total HDPE pipe length of 4,739 meters, comprising 4,222 meters of 355mm diameter HDPE pipe and 517 meters of 250mm diameter HDPE pipe. The landscaping and irrigation system is divided into two sections: 1,856 Nos sprinklers in Tract-D and the plantation of 3,500 trees in Tract-A. The TSE line will supply water to the sprinklers in Tract-D and irrigate the 3,500 trees, using a Hunter controller that will water one area in the morning and the other at night.

Soil Replacement Project (Tecnimont)

This project involves the excavation of top soil, which was then dumped at the port side. After reaching the formation level, the area was backfilled with 75mm of backfill material and compacted using a 10-ton roller.

Material Handling Project (Tecnimont)

Best Group is excited to take on the critical role of subcontractor for Tecnimont in the expansive material handling warehouse project, which is an integral component of the major polyethylene plant within the new polymers complex in Ras Laffan Industrial City, Qatar.

Given the immense scale and complexity of this venture, the demand for efficient material management and procurement has never been greater. Best Group’s involvement in this project is a testament to our expertise and commitment to supporting large-scale industrial developments. Our work on the material handling warehouse is crucial to ensuring that the construction of the polyethylene units, which boast impressive capacities of 1,000,000 tons per year and 680,000 tons per year, proceeds smoothly and efficiently.
This warehouse will be a hub for managing the vast quantities of materials required for this ground-breaking project, playing a pivotal role in the timely and effective delivery of resources. By streamlining the material flow and ensuring that all necessary components are readily available, Best Group is not only contributing to the successful realization of this strategic expansion but also reinforcing Qatar’s position as a global leader in the petrochemical sector.
Our commitment to excellence in this project underscores our dedication to fostering the growth and resilience of Qatar’s economy, while also enhancing the capabilities of the joint venture between Qatar Energy and Chevron Phillips Chemical to meet the ever-increasing global demand for polyethylene products.

Hyundai Rotem Site Project

Al Thakhira Sewage Treatment Works, Transfer Pumping Station & Associated Pipelines.

Brief description

Al Thakhira Sewage Treatment Works, serves a population of about 205,000 with a peak flow of 1,950 liters a second.

The project comprises Sewage infrastructure with a daily average flow of 56,200 m3 /day. Sewage transmission mains will comprise 21 km of twin rising mains and approximately 11 km of twin rising mains. Treatment process includes Mechanical Treatment, Biological Nutrient Removal, using Sequencing Batch Reactors (SBRs), Sand Filters and Ultrafiltration, Ultra Violet (UV) disinfection and chlorination system. The treated sewage effluent (TSE) transmission system will consist of about 38km of mains.

Amoured Rock Supply Project

Best Group, in partnership with Serka QA, successfully supplied 300 metric tons of armor rock for the MIC Construction Project, a key infrastructure development. This significant contribution involved the careful selection, sourcing, and delivery of high-quality armor rock, essential for reinforcing and stabilizing the project’s structures. The sheer scale of the supply highlights our capability to meet demanding project requirements, ensuring the durability and longevity of the construction. Through this collaboration, Best Group and Serka QA have demonstrated their combined expertise and commitment to supporting large-scale projects with the materials necessary to achieve excellence in construction and engineering.

Manpower Supply Details

Samsung C&T (NFXP Raslaffan Project)

Best Group proudly partners with Samsung C&T on the NFXP Raslaffan project, supplying a highly skilled workforce that spans both white and blue helmet professionals. Our contribution is pivotal in driving forward this critical construction initiative, ensuring that all operational stages are executed with precision and expertise. By delivering top-tier manpower, we help Samsung C&T maintain the highest standards of safety, efficiency, and quality throughout the project’s lifecycle.

Metito Overseas Qatar (WWTP EPC-1 at RLIC)

In collaboration with Metito Overseas Qatar, Best Group provides comprehensive manpower solutions for the WWTP EPC-1 project at RLIC, encompassing both construction manpower and office staff. Our white and blue helmet professionals are integral to the project’s smooth execution, ensuring that every aspect, from ground operations to administrative functions, is handled with professionalism. This partnership underscores our commitment to supporting large-scale infrastructure projects with reliable and skilled personnel.

Aqualia Mace Qatar (Sewage Treatment Plant - Ashgal)

Best Group is a key manpower supplier for Aqualia Mace Qatar’s Sewage Treatment Plant project under Ashgal, offering a well-rounded team of white and blue helmet professionals. Our workforce is instrumental in the construction and operational phases, contributing to the project’s success by ensuring that all tasks are performed to the highest industry standards. This collaboration highlights our role in enhancing Qatar’s infrastructure through dedicated and skilled manpower.

Veolia Water (Sewage Treatment Plant - Ashgal)

Partnering with Veolia Water for the Ashgal Sewage Treatment Plant, Best Group delivers specialized manpower that includes both white and blue helmet professionals. Our team plays a crucial role in supporting the construction and operational processes, ensuring that the project meets its goals efficiently and effectively. Through this partnership, we demonstrate our capability to provide reliable manpower solutions that align with the needs of complex and environmentally significant projects.

Tecnimont (Material Handling Project)

Best Group collaborates with Technimont on the TSE Line, Soil Replacement, and Material Handling project, supplying a highly skilled workforce of white and blue helmet professionals. Our team is critical in ensuring that the project’s complex technical demands are met with precision and efficiency, from soil replacement to material handling operations. By providing expert manpower, we help Technimont maintain the highest standards of safety, quality, and performance, driving the project toward successful completion.

Al Jaber and Partners Qatar Project

In collaboration with Al Jaber and Partners Qatar, Best Group delivers a comprehensive manpower solution, supplying skilled white and blue helmet professionals who are vital to the success of their construction projects. Our team is involved in all stages of development, ensuring that operations run smoothly and meet the highest industry standards. This partnership underscores our ability to provide reliable and expert manpower that drives progress and supports Al Jaber and Partners in achieving their project milestones.